Reducing the CO₂ footprint and relying fully on renewable energies - C.F. Maier is aiming for climate-neutral production in the long term.
One of the important steps in this direction was the installation of a solar plant with an output of 421.65 kWp in 2010. Considering the current situation on the energy market, this plant helps us to gain more independence in this area and thus to prepare our company for crises. We would like to consistently continue on this path: On the first of January 2023, another plant with an output of 447.64 kWp was therefore put into operation. We plan to use it to cover our electricity requirements at the Königsbronn site and to feed surpluses into the public power grid.